PORTFOLIO
Sourcing Problems, Solved.
A selection of the requirements we have delivered — from single obsolete modules to complete plant shutdown packages.
01
Oil & Gas
Middle East
Obsolete / Surplus
Obsolete Control System Module
THE REQUIREMENT
A discontinued processor module failed on a control system no longer supported by the manufacturer, and a full system upgrade was not viable within the shutdown window.
WHAT WE DID
We located tested units through our surplus network, verified firmware revision compatibility against the existing rack, and confirmed condition before dispatch.
THE OUTCOME
The plant returned to service without a control system migration.
THE REQUIREMENT
A planned turnaround required line items across many manufacturers — instrumentation, valves, drives and bearings — consolidated to a single delivery date.
WHAT WE DID
We consolidated the list into one quotation, coordinated procurement across suppliers in several regions, and staged the shipment so all items arrived together.
THE OUTCOME
One purchase order in place of many, and the complete package delivered ahead of the turnaround start.
02
Power Generation
Europe
New
Multi-Brand Shutdown Package
03
Water & Wastewater
North America
New
Emergency Instrumentation Replacement
THE REQUIREMENT
A failed transmitter took a critical process measurement offline, with local availability running to weeks.
WHAT WE DID
We sourced the unit from overseas stock, confirmed the process connection and output configuration against the existing installation, and shipped by air freight.
THE OUTCOME
On site in days rather than weeks.
THE REQUIREMENT
An equipment manufacturer needed a recurring supply of components for machines installed across multiple countries.
WHAT WE DID
We established a standing parts list with agreed pricing, held critical items against forecast demand, and shipped directly to end-user sites.
THE OUTCOME
Average fulfilment time cut substantially, across every installed site.
04
Manufacturing
Global
New & Refurbished
OEM Spare Parts Programme
05
Chemical
Asia
Refurbished
End-of-Life Drive Replacement
THE REQUIREMENT
A variable frequency drive reached end of life with no direct replacement available.
WHAT WE DID
We presented two options — a refurbished, tested unit of the original model, and the manufacturer's successor with a summary of the wiring and parameter differences.
THE OUTCOME
The customer chose the refurbished route, deferring a control panel modification to a planned outage.
READY WHEN YOU ARE
Your Requirement Is Next.
Whether it is one obsolete module or a full shutdown list, send it over — we'll come back with the routes worth considering.
or email sales@industrialabcsolutions.com